My wife, brother, father and I spent this past weekend finishing the interior of our cabin in western Wyo. We used prefinished 6" knotty pine T&G boards. Went up faster than I thought but it was two solid days of work, much on scaffolding to get it done. Also got a ceiling fan wired in. This will really help bring some of the heat down in the fall and winter. I think it turned out great. A few before and after pics.
Before
After
All that is left now is to case and trim the windows, install flooring and put river rock behind the stove.
![8015install3.jpg](https://www.monstermuleys.info/photos/user_photos2/8015install3.jpg)
Before
![4670before2.jpg](https://www.monstermuleys.info/photos/user_photos2/4670before2.jpg)
![1882before4.jpg](https://www.monstermuleys.info/photos/user_photos2/1882before4.jpg)
![1412before5.jpg](https://www.monstermuleys.info/photos/user_photos2/1412before5.jpg)
After
![3770after4.jpg](https://www.monstermuleys.info/photos/user_photos2/3770after4.jpg)
![9508after5.jpg](https://www.monstermuleys.info/photos/user_photos2/9508after5.jpg)
![3933after6.jpg](https://www.monstermuleys.info/photos/user_photos2/3933after6.jpg)
![1620after7.jpg](https://www.monstermuleys.info/photos/user_photos2/1620after7.jpg)
![9550afterpan.jpeg](https://www.monstermuleys.info/photos/user_photos2/9550afterpan.jpeg)
All that is left now is to case and trim the windows, install flooring and put river rock behind the stove.